Browsed by
Tag: burner

a complete destruction of waste from various hospital services

a complete destruction of waste from various hospital services

Medical Waste Incinerator Purpose For a complete destruction of waste from various hospital services by heat treatment of high temperature in accordance with EU standard on emission requirement. -Waste from health care activities -Infections waste, laboratory cultures, waste form operation room isolations material in contact with infected patients, waste potentially being infected by pathogenic agents.  -Pathological waste, human fragments, blood, fetus, all body fluids, human tissues. -Sculpts, needles, infusion sets, blades, glass -Pharmaceutical waste.  -Chemical waste laboratory reagents, disinfectants -Expired drugs.  -Low radiation radioactive element. Medical waste incinerator: – Ecological Requirement – No odor -No fume -Definitive treatment of waste Medical waste incinerator: – Manufacturing Standards  -UL,CE, ASME, ISA EURO emission standard  1.Medical waste incinerator  Construction – CS plate shells, FB reinforcement, cast refractory linings,                          Insulation and 14 gage aluminum jacket.  Type of fuel – Oil fired (Diesel) Burning Capacity – 250kg/hr and moisture up to 80%. Duration -8-16/Continuous   Average fuel consumption – Very little as much as possible Control Type – PLC based operation Operating Temperature – Primary chamber 800oc ± 50                                      – Secondary Chamber 1050oc ± 50 Size of incinerator – Not more than 15mx7.20m Chimney – Ø630x25meter height  and 7mm thick CS. Combustion efficiency- 99% Mode of waste handling- Semi-automatic via ram loader. Mode of ash handling – Semi-automatic via grate and ash trolley. Pollution control equipment- Dry settlement zone Doors- 1-waste charging door in primary chamber             1-clinker door in primary chamber             1-ash trolley access door in primary chamber             1-clean out door in secondary chamber Burner – 2- ignition burner in primary chamber                2- after burner in secondary chamber.             Type- package mono block-fully automatic Type of burner operation- modulation control Forced draught fan- 1-primary air fan                                 1-secondary air fan               Fuel storage tank – Capacity- 2500liter above ground                              – Material-6mm thick mild steel                              – 2-diesel pump, gate valve, safety valve, strainer                                 Pipe, pressure gage, check valve, control board                                 Level indicator. Etc Refractory/insulation thickness- not less than 225mm Ram loader capacity- 0.75m3 Electrical supply- 380v/3ph/50 Hz Finish and painting type- powder coated  Audio/ visual alarm system- burner lockout, overload fault  Electrical accessories- primary and secondary chamber temperature                                    Controller/indicator, auto controls, electrical                                    Control switches, push buttons, relays, contactors                                   Thermocouples, burner sequence controllers,                                   Timers, emergency stop and alarms.

Incinerator Operating period Anticipated daily period 8 hours

Incinerator Operating period Anticipated daily period 8 hours

Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level Ignition burners Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor Maximum rating :               at least 450kw/hour Burner:                                  arranged for on/off operation Maximum consumption :   at least 6litres per hour Average consumption :      at least 3litres/hour After burner Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves fan and motor. Maximum rating :     At least 450kw/hour Burner:                        arranged for on/off operation Maximum consumption:     at least 9 litres/hour Average consumption:         at least 4.5 litres /hour Flue gas treatment Should have particulate remover (scrubbers) Electrical supply Single phase 220/240v a.c,50/60hz Documentation Operation manual   2 sets Service /maintenance manual 2 sets

Incinerator Operating period Anticipated daily period 8 hours

Incinerator Operating period Anticipated daily period 8 hours

Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level Ignition burners Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor Maximum rating :               at least 450kw/hour Burner:                                  arranged for on/off operation Maximum consumption :   at least 6litres per hour Average consumption :      at least 3litres/hour After burner Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves fan and motor. Maximum rating :     At least 450kw/hour Burner:                        arranged for on/off operation Maximum consumption:     at least 9 litres/hour Average consumption:         at least 4.5 litres /hour Flue gas treatment Should have particulate remover (scrubbers) Electrical supply Single phase 220/240v a.c,50/60hz Documentation Operation manual   2 sets Service /maintenance manual 2 sets