Browsed by
Tag: incinerator

Controlled air medical waste incinerator designed for incineration of bio-medical waste

Controlled air medical waste incinerator designed for incineration of bio-medical waste

Controlled air medical waste incinerator designed for incineration of bio-medical waste generated at a blood-processing center. The waste to be treated mainly includes bio-waste (i.e. bodily fluids), infectious and hazardous waste such as syringes, needles, and other medical waste (i.e. silicon rubbers, plastic, textiles, papers, packs, etc.) Operational Specs Physical Specs Combustion Chamber Volume (m3) 8.80m3 Burn Rate* up to 1,500kg per hour Average Fuel Consumption 65 kg per hour or more (7 diesel burners) Operational Temperature 850 – 1320°C Gas Retention in Secondary Chamber Large secondary chamber     Temperature Monitoring Yes     Average ash residue (%) 3%     Thermostatic Device Yes   1000l diesel flue tank Venture gas scrubber Hydraulic Ram Feeding System Diesel Powered Large Incinerator Minimum Specification Required Standards 1) Bidder or Manufacturer ISO 9001 Certified 2) Respecting international emission standards Electrical characteristics 3) A 230V, 60Hz single-phase electrical source. 4) Protections against over-voltage and over-current line conditions. 5) Compliance with applicable Ghanaian standards and regulations. Operational characteristics 6) Two-stage incineration with dual chamber combustion 7) Burn rate: 15 – 20 Kg/h 8) Capacity: not less than 130 L 9) Concentrations of most pollutants in stack gases below detection limits 10) Diesel fuel 11) Electronic system control 12) Easy to operate and minimal training 13) Any accessory or dedicated device necessary to the proper functioning and utilization of the equipment included PLEASE REFER TO BROCHURES ATTACHED FOR DETAILED SPECIFICATION

Controlled air medical waste incinerator designed for incineration of bio-medical waste

Controlled air medical waste incinerator designed for incineration of bio-medical waste

Controlled air medical waste incinerator designed for incineration of bio-medical waste generated at a blood-processing center. The waste to be treated mainly includes bio-waste (i.e. bodily fluids), infectious and hazardous waste such as syringes, needles, and other medical waste (i.e. silicon rubbers, plastic, textiles, papers, packs, etc.) Operational Specs Physical Specs Combustion Chamber Volume (m3) 8.80m3 Burn Rate* up to 1,500kg per hour Average Fuel Consumption 65 kg per hour or more (7 diesel burners) Operational Temperature 850 – 1320°C Gas Retention in Secondary Chamber Large secondary chamber     Temperature Monitoring Yes     Average ash residue (%) 3%     Thermostatic Device Yes   1000l diesel flue tank Venture gas scrubber Hydraulic Ram Feeding System Diesel Powered Large Incinerator Minimum Specification Required Standards 1) Bidder or Manufacturer ISO 9001 Certified 2) Respecting international emission standards Electrical characteristics 3) A 230V, 60Hz single-phase electrical source. 4) Protections against over-voltage and over-current line conditions. 5) Compliance with applicable Ghanaian standards and regulations. Operational characteristics 6) Two-stage incineration with dual chamber combustion 7) Burn rate: 15 – 20 Kg/h 8) Capacity: not less than 130 L 9) Concentrations of most pollutants in stack gases below detection limits 10) Diesel fuel 11) Electronic system control 12) Easy to operate and minimal training 13) Any accessory or dedicated device necessary to the proper functioning and utilization of the equipment included PLEASE REFER TO BROCHURES ATTACHED FOR DETAILED SPECIFICATION

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day  Control: Built-in data recording Operating temperature: Incinerator  /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: continuous loading, Top Loading Capacity/Burn rate per hour: 250 -300 kg/hr  Material: External- 3 layers  Internal lining:  a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shock Secondary  Combustion  Chamber: Type: horizontal/vertical Temperature:  1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc  Auxiliary device: Fuel cut-off device Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                       Chimney (Stack): Type: Vertical type height:>7 meter’ Material: Fireproof cast, stainless steel OUTPUT:  GAS- SMOKELESS,ODORLESS  ASH -Max <5% of original waste size Reduction of Pollutant gas SO2, HCL, HF and line particulate Emission standard: WHO/ European Test report for emission testing provided? Heat exchange mode: Automatic Accessories:   All standard accessories for incinerator, including but not limited to loading system, heat exchangers, pollution control system, ash removal system, including ladder and oil tanker (2500litre capacity). Operating Environment:  The incinerator is capable to operate at the altitude of 2400mt above sea level. (according to the site conditions) Power Requirement: 220 Vac single phase or 380 Vac three phase 4 wire system  50HZ    Installation Testing and Commissioning :   to be conducted by certified or qualified personnel.   Supplier shall provide the following documentation     User (Operating) manual in English.  Service (Technical / Maintenance) manual in English.  Certificate of calibration and inspection from factory.  Fast moving spare parts: Supplier is able to provide fast moving spare parts with quantities as described in the price schedule or their equivalent.  Training: Supplier is able to provide training on operation, management and maintenance of incinerators.    Warranty  Comprehensive warranty for minimum 2 year.  Maintenance Service during Warranty Period  During warranty period supplier must ensure, corrective/breakdown maintenance whenever required.  Supplier has a local agent or branch office in Ethiopia (please indicate the name and contact details of the agent)  Supplier provides labor, lifting equipment and tools needed for the installation, testing and commissioning of the incinerator. The supplier will be responsible for the safety of its staff, workers and laborers during the installation, testing & commisssioning  Able to provides all necessary information that would be used as an input for preparation of floor (platform) and room for the incinerator to be supplied such as the following;  Lay outs (drawings) and  pictures of the incinerators to be installed   Length, width and height of incinerator,  Area (length x width) for the floor (platform) and Length, width and height for roofing, for each type of incinerators to be installed  Needs during the transport, installation, assembly, commissioning and operation of the equipment in terms of access points, available space to operate (inside and outside of the room), ways to get to the site where the equipment will be placed or any others. ;  Technical Specifications (fuel consumption rate, weight, anchoring system, support points, etc.);  Chimney specifications to be used for the roof design ( size, support needs, insulation);  Considerations related to operation and Maintenance, for e.g., minimum available area to perform routine maintenance tasks and replacement of key parts that need to be changed more frequently;  Any consideration/need of the incinerator while being operated that might impact the design of the room/shelter where it will be placed. Other important information to be considered that can influence or impact the designing and building processes of the infrastructure for the incinerators, for example area dimension for other accessary parts like fuel tanker storage, if applicable, etc….  Delivery time (DAP, Addis Ababa) in weeks Name of manufacturer including website of the manufacturer &/ supplier & country of origin