Browsed by
Tag: type

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day  Control: Built-in data recording Operating temperature: Incinerator  /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: horizontal/vertical Temperature:  1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc  Auxiliary device: Fuel cut-off device Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                       Chimney (Stack): Type: Vertical type height:>7 meter’ Material: Fireproof cast, stainless steel OUTPUT:  GAS- SMOKELESS,ODORLESS  ASH -Max <5% of original waste size Reduction of Pollutant gas SO2, HCL, HF and line particulate Emission standard: WHO/ European Test report for emission testing provided? Heat exchange mode: Automatic Type: Constant loading, Top LoadingCapacity/Burn Speed per hour: 250 -300 kg/hr Substance:External- 3 layers Internal lining:  a fire proof material of pre-fired refractory bricks Using Aluminium lining, resistant to corrosive Gas or Waste and Also to thermal shockSecondary Combustion Chamber:

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day  Control: Built-in data recording Operating temperature: Incinerator  /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: horizontal/vertical Temperature:  1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc  Auxiliary device: Fuel cut-off device Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                       Chimney (Stack): Type: Vertical type height:>7 meter’ Material: Fireproof cast, stainless steel OUTPUT:  GAS- SMOKELESS,ODORLESS  ASH -Max <5% of original waste size Reduction of Pollutant gas SO2, HCL, HF and line particulate Emission standard: WHO/ European Test report for emission testing provided? Heat exchange mode: Automatic Type: Constant loading, Top LoadingCapacity/Burn rate per hour: 250 -300 kg/hr Substance:External- 3 layers Internal Liner:  a fire proof material of pre-fired refractory bricks Using Aluminium Liner resistant to corrosive Gas or Waste and Also to thermal shockSecondary Combustion Chamber:

One chamber incinerator

One chamber incinerator

One (MAIN) chamber only, with two doors Doors with hinges at the center LPG combustible mainly After burner and chimney don′t change MAIN Chamber dimensions [LxWxH]: 2.2m x 4.5m x 2.8m, so we can put two containers within the MAIN chamber Ok per your comment, refractory concrete and fire brick inside the chamber; feed door with refractory concrete Burning Rate:47.5–50kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash post 100kg:Max 3.8kg 1)      This type is suitable for medical waste, but how many kilos can be put in the incinerator in one time 2)      Q: Operation and maintenance costs, these costs are based on?? What if we use it every day?? 3)      How many hertz do we need for this type of incinerator 4)      Where is the oil tank in the incinerator? 5)      Is it possible to build in not the standard accessories but the high proof accessories? 6)      What are the costs when shipment is to Surinam/South America 7)      How will the inicinerator be delivered? Partly installated or do we have to install it completly?  And in addition, the other models with less burn rate capacity as TS100(PLC); TS50(PLC); TS30(PLC); TS20(PLC) and TS10(PLC), interests also our company. So, would you give also Proforma Invoices of these models in CIF Prices to Port of Abidjan.   Furthermore, as the Incinerators have to be installed at nationwide, there are always great power cuts in our country. So, we would like to know if you can supply each Incinerator with a diesel engine (generator) which power is adapted to the power of the Incinerator unit?