Browsed by
Tag: chamber

Design standard Multiple chamber incinerator

Design standard Multiple chamber incinerator

Waste type organics domestical  waste Calorific value of waste 9,25 MJ/kg Ash content 20.80 % Density 291 Kg/m3 Waste quantity (kg per hr) 12,500 Total Heat input (Gcal/hr) 23.71 organics domestical  waste Solid Domestic waste, after separating the recyclable, such as: plastic, cloth, metal, paper, wood, glass, stones, etc. than larger 10 cms Design standard Multiple chamber incinerator to the design of EPA  standards, Air pollution control Description of the Chimney Top mounted, self supporting Incinerator performance 150kg/hr Refuse  Hospital waste and carcasses Recommended Temperatures Minimum 1000⁰C Dimensions: Length  Width  Height  Extra width for burners At least 3000mm Loading door opening Minimum 700mm x 600mm Hearth area 5.00square meters Description or grate/hearth A full hearth supplied to prevent contaminated liquids from flowing into the ash pit without being incinerated Primary chamber volume At least 3 cubic meters Mixing chamber volume At least 1 cubic meters Settling chamber volume At least 3 cubic meters Weight excluding chimney 15, 000kg at manufacture Firing tools supplied Hoe, Poker and rake

Design standard Multiple chamber incinerator

Design standard Multiple chamber incinerator

Waste type organics domestical  waste Calorific value of waste 9,25 MJ/kg Ash content 20.80 % Density 291 Kg/m3 Waste quantity (kg per hr) 12,500 Total Heat input (Gcal/hr) 23.71 organics domestical  waste Solid Domestic waste, after separating the recyclable, such as: plastic, cloth, metal, paper, wood, glass, stones, etc. than larger 10 cms Design standard Multiple chamber incinerator to the design of EPA  standards, Air pollution control Description of the Chimney Top mounted, self supporting Incinerator performance 150kg/hr Refuse  Hospital waste and carcasses Recommended Temperatures Minimum 1000⁰C Dimensions: Length  Width  Height  Extra width for burners At least 3000mm Loading door opening Minimum 700mm x 600mm Hearth area 5.00square meters Description or grate/hearth A full hearth supplied to prevent contaminated liquids from flowing into the ash pit without being incinerated Primary chamber volume At least 3 cubic meters Mixing chamber volume At least 1 cubic meters Settling chamber volume At least 3 cubic meters Weight excluding chimney 15, 000kg at manufacture Firing tools supplied Hoe, Poker and rake

a complete destruction of waste from various hospital services

a complete destruction of waste from various hospital services

Medical Waste Incinerator Purpose For a complete destruction of waste from various hospital services by heat treatment of high temperature in accordance with EU standard on emission requirement. -Waste from health care activities -Infections waste, laboratory cultures, waste form operation room isolations material in contact with infected patients, waste potentially being infected by pathogenic agents.  -Pathological waste, human fragments, blood, fetus, all body fluids, human tissues. -Sculpts, needles, infusion sets, blades, glass -Pharmaceutical waste.  -Chemical waste laboratory reagents, disinfectants -Expired drugs.  -Low radiation radioactive element. Medical waste incinerator: – Ecological Requirement – No odor -No fume -Definitive treatment of waste Medical waste incinerator: – Manufacturing Standards  -UL,CE, ASME, ISA EURO emission standard  1.Medical waste incinerator  Construction – CS plate shells, FB reinforcement, cast refractory linings,                          Insulation and 14 gage aluminum jacket.  Type of fuel – Oil fired (Diesel) Burning Capacity – 250kg/hr and moisture up to 80%. Duration -8-16/Continuous   Average fuel consumption – Very little as much as possible Control Type – PLC based operation Operating Temperature – Primary chamber 800oc ± 50                                      – Secondary Chamber 1050oc ± 50 Size of incinerator – Not more than 15mx7.20m Chimney – Ø630x25meter height  and 7mm thick CS. Combustion efficiency- 99% Mode of waste handling- Semi-automatic via ram loader. Mode of ash handling – Semi-automatic via grate and ash trolley. Pollution control equipment- Dry settlement zone Doors- 1-waste charging door in primary chamber             1-clinker door in primary chamber             1-ash trolley access door in primary chamber             1-clean out door in secondary chamber Burner – 2- ignition burner in primary chamber                2- after burner in secondary chamber.             Type- package mono block-fully automatic Type of burner operation- modulation control Forced draught fan- 1-primary air fan                                 1-secondary air fan               Fuel storage tank – Capacity- 2500liter above ground                              – Material-6mm thick mild steel                              – 2-diesel pump, gate valve, safety valve, strainer                                 Pipe, pressure gage, check valve, control board                                 Level indicator. Etc Refractory/insulation thickness- not less than 225mm Ram loader capacity- 0.75m3 Electrical supply- 380v/3ph/50 Hz Finish and painting type- powder coated  Audio/ visual alarm system- burner lockout, overload fault  Electrical accessories- primary and secondary chamber temperature                                    Controller/indicator, auto controls, electrical                                    Control switches, push buttons, relays, contactors                                   Thermocouples, burner sequence controllers,                                   Timers, emergency stop and alarms.