Browsed by
Tag: chamber

a complete destruction of waste from various hospital services

a complete destruction of waste from various hospital services

Medical Waste Incinerator Purpose For a complete destruction of waste from various hospital services by heat treatment of high temperature in accordance with EU standard on emission requirement. -Waste from health care activities -Infections waste, laboratory cultures, waste form operation room isolations material in contact with infected patients, waste potentially being infected by pathogenic agents.  -Pathological waste, human fragments, blood, fetus, all body fluids, human tissues. -Sculpts, needles, infusion sets, blades, glass -Pharmaceutical waste.  -Chemical waste laboratory reagents, disinfectants -Expired drugs.  -Low radiation radioactive element. Medical waste incinerator: – Ecological Requirement – No odor -No fume -Definitive treatment of waste Medical waste incinerator: – Manufacturing Standards  -UL,CE, ASME, ISA EURO emission standard  1.Medical waste incinerator  Construction – CS plate shells, FB reinforcement, cast refractory linings,                          Insulation and 14 gage aluminum jacket.  Type of fuel – Oil fired (Diesel) Burning Capacity – 250kg/hr and moisture up to 80%. Duration -8-16/Continuous   Average fuel consumption – Very little as much as possible Control Type – PLC based operation Operating Temperature – Primary chamber 800oc ± 50                                      – Secondary Chamber 1050oc ± 50 Size of incinerator – Not more than 15mx7.20m Chimney – Ø630x25meter height  and 7mm thick CS. Combustion efficiency- 99% Mode of waste handling- Semi-automatic via ram loader. Mode of ash handling – Semi-automatic via grate and ash trolley. Pollution control equipment- Dry settlement zone Doors- 1-waste charging door in primary chamber             1-clinker door in primary chamber             1-ash trolley access door in primary chamber             1-clean out door in secondary chamber Burner – 2- ignition burner in primary chamber                2- after burner in secondary chamber.             Type- package mono block-fully automatic Type of burner operation- modulation control Forced draught fan- 1-primary air fan                                 1-secondary air fan               Fuel storage tank – Capacity- 2500liter above ground                              – Material-6mm thick mild steel                              – 2-diesel pump, gate valve, safety valve, strainer                                 Pipe, pressure gage, check valve, control board                                 Level indicator. Etc Refractory/insulation thickness- not less than 225mm Ram loader capacity- 0.75m3 Electrical supply- 380v/3ph/50 Hz Finish and painting type- powder coated  Audio/ visual alarm system- burner lockout, overload fault  Electrical accessories- primary and secondary chamber temperature                                    Controller/indicator, auto controls, electrical                                    Control switches, push buttons, relays, contactors                                   Thermocouples, burner sequence controllers,                                   Timers, emergency stop and alarms.

Medical Incineraotors chamber of post combustion

Medical Incineraotors chamber of post combustion

1.A chamber of post combustion of gases A burner of combustion of gases, A device of injection of air allowing a total re-combustion of gases, A device of air inlet of cooling of waste gases, A sheath of evacuation of the gases burnt, Carcass in strong sheet steel with support of connection Composition of the refractory; Refractory concrete: Thickness :>150mm Nature: 65%% of Al203 Insulate in fibrous panels: Thickness: >85mm Nature: Calcium Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation,  electromagnetic sluice gate of regulation and isolating valve. A secondary injection of air to ensure perfect oxygen content. 2.A control box ensuring the complete cycle of combustion. 3.Fan: Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of  the automatic cycle. 4.Controls and regulations: Control box watertight to dust, including: A switch circuit breaker for each engine (ventilators and burners). A timer with adjustable temporization for the regulation of each burner. A regulator with digital watching for the temperature of combustion. A regulator with digital watching for the temperature of post-combustion. Electric box. 5.The de-ashing must be done in the bottom of the combustion chamber or the de-ashing should be automatic or manual batch de-ashing. 6.Process filtering system: scrubber to be mentioned as optional 7.Emission standards compliance: BS 3316 or equivalent standard 8.Capacity to treat plastic: not less than 40% by weight 9.CE manufacturing compliance: BS EN 746-2-1997

Medical Incineraotors chamber of post combustion

Medical Incineraotors chamber of post combustion

1.A chamber of post combustion of gases A burner of combustion of gases, A device of injection of air allowing a total re-combustion of gases, A device of air inlet of cooling of waste gases, A sheath of evacuation of the gases burnt, Carcass in strong sheet steel with support of connection Composition of the refractory; Refractory concrete: Thickness :>150mm Nature: 65%% of Al203 Insulate in fibrous panels: Thickness: >85mm Nature: Calcium Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation,  electromagnetic sluice gate of regulation and isolating valve. A secondary injection of air to ensure perfect oxygen content. 2.A control box ensuring the complete cycle of combustion. 3.Fan: Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of  the automatic cycle. 4.Controls and regulations: Control box watertight to dust, including: A switch circuit breaker for each engine (ventilators and burners). A timer with adjustable temporization for the regulation of each burner. A regulator with digital watching for the temperature of combustion. A regulator with digital watching for the temperature of post-combustion. Electric box. 5.The de-ashing must be done in the bottom of the combustion chamber or the de-ashing should be automatic or manual batch de-ashing. 6.Process filtering system: scrubber to be mentioned as optional 7.Emission standards compliance: BS 3316 or equivalent standard 8.Capacity to treat plastic: not less than 40% by weight 9.CE manufacturing compliance: BS EN 746-2-1997